Skip to main content

Generating Sales Proposals from Inspection Tickets

How to generate a professional sales proposal (PDF report) directly from an Inspection Ticket in Terial using the Report Builder.

Written by Loren Heinbach
Updated over a week ago

This guide covers how to generate a professional Sales Proposal directly from the Report Builder Card within an Inspection Ticket in Terial. Before generating the report, ensure all relevant inspection details are properly filled out.

Video Tutorial: Watch this short video to master creating a sales proposal.

Step 1: Ensure Inspection Details Are Complete

Best practice is to ensure the following items are accurately documented in the Inspection Ticket:

  • Property Overview Photo is uploaded

  • Estimated Repair Costs are included

  • Description/Proposed Fix has been updated

  • Priority is set

  • Photos have been captioned and rotated to display horizontally

Step 2: Customize the Report in the Report Builder

In the Report Builder Card, click Start. From there, you can:

  • Update the Inspection Title

  • Add a Report Sub Header

  • Edit the Inspection Intro Text

  • Select a Recommendation from the dropdown

Hit Save

Step 3: Download the Report

Click Download Report, then toggle on "Include signature block" to add a sign-off section to your PDF.

Notice the changes updated in the PDF report:

Pro Tip: You can update your Inspection Intro, Recommendations, and Terms & Conditions in the Admin Panel under the Reports Tab.

Feedback or questions on the product? Email us at [email protected]

Did this answer your question?