Recording Deliveries in Terial

How to record project deliveries and match back to production job costing.

Written by Loren Heinbach
Updated over a week ago

ℹ️ Purpose: Deliveries let you track what materials actually arrived on-site, compare them against what was ordered, and attach photos or documentation for internal review.

You can track a delivery before or after receiving the AP Invoice

Terial supports two ways to record deliveries:


A. Convert a Purchase Order into a Delivery (Recommended)

Use this when materials received correspond to items on an existing PO.

Steps

  1. Open the Purchase Order

    Navigate to Production → Purchase Orders and open the PO you want to convert.

  2. Select the items delivered

    Check the boxes next to the relevant line items.

    • You can select all items or only the ones delivered.

  3. Click "+ Delivery"

    • This opens a modal with two choices:

      • New Delivery – Create a brand-new delivery for these items.

      • Existing Delivery – Add the items to an already-open delivery.

  4. Fill out Delivery Details

    • You'll be taken to the Delivery editing page.


      Required:

      • Status (defaults to Delivered)

      • Assigned To (the person responsible for verifying deliveries)


      Optional:

      • Date Received

      • Delivery Address (pre-filled from the PO)

      • Notes

      • Upload photos (delivery slips, materials, site photos)

  5. Record quantities received

    • At the bottom table:

      • Use the arrow icons to copy the "Ordered" quantity into "Received" if they match.

      • Adjust manually if only a partial shipment arrived.

      • Click + Delivery Row to add additional items not from that PO.

  6. Save

    • Once saved, a notification modal will appear prompting you to email internal project members. This step is optional.


B. Create a Delivery Manually (Not From a PO)

Use this for walk-in purchases, field-reported material drops, or deliveries not tied to a specific PO.

Where to start

You can create a new delivery from two places:

Option 1: From the Deliveries Page

  • Go to Production → Deliveries in the left navigation.

  • Click + New Delivery.

Option 2: From a Project Page

  • Open the project.

  • Click the context menu (three dots) → Deliveries.

  • Click + New Delivery.

Steps to Complete the Delivery

  1. Enter delivery information


    Required:

    • Status

    • Assigned To


    Optional:

    • Date Received

    • Delivery Address

    • Notes

    • Photos (recommended for audit trail)

  2. Add materials manually

    • Click + Delivery Row

    • Choose a project and associated PO/material (if applicable), or use the global search to add any material from the system.

  3. Enter quantities received

    You'll only fill out the "Received" column since there's no associated PO data to pull from.

  4. Save and optionally notify internal team members.


Summary: When to Use Which Method

Method

Use When

Benefits

Convert from PO

Materials were previously ordered via Terial

Auto-populates quantities and materials, cleaner cost tracking

New Delivery (manual)

Delivery is not tied to a PO or partially came from outside vendors

Flexible, supports field-reported materials and miscellaneous items


Ready for the next steps?